Roadway Threats
Update on the SW/NW 80th/70th Avenue Road Widening
The road improvement project is 10.5 miles long and extends from just north of SR 200 to about one quarter to one half-mile north of US 27. Due to the existing businesses, houses, and Westport High School, the width and design of the road will be modified to accommodate the existing uses. Most of the road widening will occur on the west side of the existing road. At the widest point, the road and multiuse paths will be 120’. The multiuse paths vary from 10’ to 14’ wide and they also include a designated bike path. Other potential sections of the road will be 100’ with a 5’ sidewalk and 4’ bike lane next to the 12’ travel lane for cars. The designs presented were preliminary design of the road will be approved after further input is received.
UPDATE: Five Major Road Widening and Intersection Improvements
One of the largest road projects is a new interchange on the east side of I-75 at NW 49th St/NW 35th St. This new interchange will travel over I-75 to connect into the existing road at NW 49th St./NW 44th Ave. on the west side. A new intersection will also be built at NW 49th St./NW 44th Ave. From this new intersection, a new two-lane road will be built to connect to CR 225A north of the intersection at US 27.
Horse Farms Forever Neutral on Proposed Alternative Routes for the Northern Turnpike Extension
The proposed alternatives routes for the Northern Turnpike Extension avoid the Farmland Preservation Area and other major Marion County horse farms. Thus, at this time Horse Farms Forever takes a neutral position on the proposed alternatives to the northern extension of the turnpike.
In our watchdog role, HFF will continue to closely monitor the situation to assure there are no detrimental impacts to the Farmland Preservation Area. In addition, we will be attending the two upcoming public meetings.
Public Hearing Notice: I75 Interchange at NW 49th Street
On Wednesday, November 18, 5:30 to 7:30 pm, a public hearing will take place. The public is invited. We will be there as FDOT shares the results of their study. The public is invited to comment on the “the location, conceptual design, and social, economic and environmental effects of the proposed improvements.” We intend to suggest some improvements that would make the interchange a fitting gateway for the Horse Capital of the World® and the Farmland Preservation Area. It is our intention always to work collaboratively and affect positive change where necessary to protect Marion County’s global brand. Instructions for participation in person and virtually are in the hearing notice below:
In Praise of Pink – Northern Turnpike Connector Report for April
Hot pink areas will not be impacted by the proposed Northern Turnpike Corridor. Our FPA ranks right up there with springs, military bases, tribal lands and national register sites.
Always Watching

We work hard to keep you informed, and to represent our members' interests in preserving our horse farms, farmland and the unique character and culture of Marion County's 193,000 acre Farmland Preservation Area.
Join the herd. Every voice matters.
Follow Us
When the farmland watchdogs sound the alarm, you'll hear first.





