In October 2021, Florida’s Turnpike Enterprise (FTE), part of the Florida Department of Transportation (FDOT), began an Alternative Corridor Evaluation (ACE) study to evaluate the extension of Florida’s Turnpike from its northerly terminus in Wildwood to a logical and appropriate terminus as determined by FDOT.  The Northern Turnpike Extension (NTE) study area includes Citrus, Levy, Marion, and Sumter counties.

Horse Farms Forever® has taken a neutral position on the ACE Study because the four proposed corridors were not located inside the Farmland Preservation Area.

HFF’s policy statement on transportation reads: Any new road projects within the Farmland Preservation Area should use existing rights-of-way. This position aligns with Marion County’s Comprehensive Plan Policy 3.3.1 Elements of Rural Character which states: “Transportation: New transportation corridors intended to be used specifically for the construction of expressways or limited access roadways shall avoid the Farmland Preservation Area.”

In our role as a watchdog of government actions, Horse Farms Forever® staff recently met with members of the NTE project team from FTE to learn more about the process of developing corridors and the parameters used to evaluate corridor alternatives, and ultimately select a route for the proposed NTE.

Phase 1 Is All About Choosing A Corridor

In the next 20 years, Florida’s population is projected to increase by five million people to 26 million residents.(1) With this expected population growth, the transportation systems must also grow to provide a safe and reliable transportation network. To accommodate this growth, FTE is conducting a study to evaluate an extension of Florida’s Turnpike. The ACE process is used to identify, evaluate, and eliminate alternative corridors on qualifying projects. The main goal of the ACE study is to narrow the potential four corridor alternatives down to one corridor.

Phase 2 Will Look At Several Alignments – And Also No Build

The recommended corridor from the ACE study is the basis for Phase 2 of the project, the Project Development and Environment (PD&E) study phase. In this phase, the recommended alternative corridor goes through further detailed evaluation to refine a range of alternatives within the selected corridor. The PD&E study will also evaluate a No-Build option as well as potential Transportation Systems Management and Operations (TSM&O) improvements such as ramp signals or work zone traffic management.

“It’s a long process and we are very early in the planning phase. There are five steps from planning to construction and finally operation,” said William Burke, FTE Project Manager (HDR). “We are evaluating all of the corridors against the goals of the project, but also how they impact the environment, traffic, and cost.”

Jennifer Stults, FDOT Planning and Environmental Management Administrator, emphasized that this phase is focused on mapping by using Geographic Information Systems (GIS) data and characterized it as an exercise in avoidance to help protect environmentally sensitive areas, natural resources and residential areas.

“At this phase, the corridors are broad to allow us to evaluate the area, but we will narrow the focus and refine the corridors based on information that is processed. This will allow us to accommodate those areas that we want to avoid,” said Stults. She also emphasized that the project team is sensitive to local land use decisions and conservation areas. “We want to be a good partner,” said Stults. “We work closely with our local partners to identify some of the things in process that we would not be aware of yet. This is why our ongoing robust community engagement work is so important. We absolutely want to hear from our stakeholders.”

For example, not only are existing conservation areas avoided, but also the areas that have been identified for conservation as part of a local or state program, or those areas that are part of the optimum boundary of the conservation area. In addition to public conservation lands such as state parks, the team is also mindful of privately-owned land with a conservation easement that has been delineated in the GIS mapping data.

 “There are a lot of different types of conservation land with different types of habitat, and if there is land with a conservation easement here and one without a conservation there, we are going to route around the land with the easement whenever possible,” said Burke. “There could be some exceptions, but generally speaking we would avoid those areas as much as possible.”

Conservation Is Written Into The Statute

The ACE study will identify preliminary environmental impacts and any potential impacts to existing conservation lands will be further evaluated and mitigated in the PD&E study to the greatest extent possible. 

There are two important sections in the enabling Statute to mitigate environmental impacts:

(7) The department shall consider innovative concepts to combine right-of-way acquisition with the acquisition of lands or easements to facilitate environmental mitigation or ecosystem, wildlife habitat, or water quality protection or restoration.

(8)(b) To the greatest extent practicable, roadway alignments, project alignment, and interchange locations shall be designed so that project rights-of-way are not located within conservation lands acquired under the Florida Preservation 2000 Act established in s. 259.101 and the Florida Forever Act established in s. 259.105.

NTE Scope Is Narrower than M-CORES

The NTE and Multi-use Corridors of Regional Economic Significance (M-CORES) program are different projects. The goals of the NTE are to enhance regional connectivity, accommodate increased travel demand, address regional congestion and safety, and improve emergency response. The M-CORES program conversely had a broader statewide goal of implementing regional corridors that were intended to accommodate multiple modes of transportation and multiple types of infrastructure. The M-CORES program was planned to address various issues beyond those typically accommodated in FDOT projects such as broadband, water, and sewer connectivity; energy distribution; trade and logistics; mobility as a service; and availability of a trained workforce skilled in traditional and emerging technologies, among others.

During the 2021 legislative session, Florida Statute 338.2278, repealed M-CORES.  The same legislation authorized study of the NTE. 

Interchange Features Can Be Controlled By Local Governments

The project team will work with local governments to determine the location of proposed interchanges and to determine the features of the interchange, such as a gateway feature or region-specific landscape features. Local governments can also include restrictions in the comprehensive plan to determine development around the interchange. This is one way to reduce urban sprawl.

“In Citrus County, there is an interchange management plan,” said Stults. “Also, along the Turnpike, with limited access, there are areas where minimum development has occurred for decades. That is where the local planning agencies are able to choose what they would like to see happen in their community.”

Project Schedule Is Driven By Public Interest

FTE initiated the planning phase of the Northern Turnpike Extension project in October 2021. The project is currently in early stages of development with the Efficient Transportation Decision Making screening and the ACE underway. Based on the high level of engagement and interest, FDOT is increasing opportunities to engage with local governments, stakeholders, and residents within the study area. The additional engagement efforts and increased public interest are underway and will continue to influence the project schedule. The project website remains an up-to-date and dependable resource for information and opportunities to provide feedback. Public engagement will continue to shape how the Northern Turnpike Extension supports regional and statewide needs as it moves through all phases of the project development process.

 

Source: Northern Turnpike Extension – Florida’s Turnpike (floridasturnpike.com)

NTE End Point Will Be Decided

 One of the main goals of the ACE study is to determine the project limits. Stults also emphasized that public participation is important and will help influence the route of the corridor.

 “The Northern Turnpike Extension will end at a point that is to be determined only after further study is completed and feedback from stakeholders is reviewed. We are still in that gathering process,” said Stults.

Because SB 100 (2021) gave the FDOT the authority to determine the end point for the NTE, it does not have to connect with the Suncoast Parkway. This gave the project team more flexibility when developing the four corridor alternatives.

The two northern corridor alternatives end at different locations along US 19 (98), while the central and the southern corridors end at US 19 (98) or the future location of the Suncoast Parkway. The longest corridor (Alternative Corridor North A) stretches nearly 75 miles across three counties to end at Chiefland. The three other corridors take a more westerly direction and are much shorter.

The legislation requires the FDOT to take into consideration the previous task force reports. These reports may help determine the route.

 (6) Any existing applicable requirements relating to turnpike projects apply to projects undertaken by the Turnpike Enterprise pursuant to this section. The Turnpike Enterprise shall take into consideration the guidance and recommendations of any previous studies or reports relevant to the projects authorized by this section and ss. 339.67 and 339.68, including, but not limited to, the task force reports prepared pursuant to chapter 2019-43, Laws of Florida, and with respect to any extension of the Florida Turnpike from its northerly terminus in Wildwood.

***

Horse Farms Forever® thanks the Florida’s Turnpike Enterprise team for taking the time to discuss the process of selecting corridors and the parameters used to select a route for the proposed Northern Turnpike Extension project. 

 

Public Input Requested

In addition to holding public meetings, the Department engages the public on all its projects and welcomes your feedback.

The project team also strongly encourages residents to submit comments using the online comment form.

 “Just keep an open mind and give us as many detailed comments as you want to submit,” said Stults. “Folks are entitled to their opinion, but the more specific the suggestions are, the more it helps the team fine-tune the route.”

For other project information, please contact:

William Burke, PLA

Project Manager
Florida’s Turnpike Enterprise (HDR)

407-264-3142 | william.burke@dot.state.fl.us

Northern Turnpike Extension Webpage: www.floridasturnpike.com/NTE

 

Suncoast Parkway 2 Under Construction

The Suncoast Parkway 2, or the Suncoast extension, is shown on the study area map for the Northern Turnpike Extension project, but it is a separate road improvement project that is located entirely in Citrus County. Phase 1 of the Suncoast Parkway extension was recently opened to traffic and ends at SR 44. Phases 2 and 3 are in the Design Phase and sections of the road are funded for construction. These sections combine for 13 miles, starting at SR 44 and connecting to US 19.

Here’s a link to a detailed map, information, and schedule. 

Contact the County about the EAR:

For any additional questions regarding the EAR process, please email Planning@MarionFL.org with your subject line including 'EAR' or call us at 352-438-2675 & ask for a planner.

https://www.marionfl.org/agencies-departments/departments-facilities-offices/growth-services/planning-zoning/ear

The workshops will be livestreamed. Check the County’s agenda webpage for the link: https://marionfl.legistar.com/Calendar.aspx

Farmland Preservation Month Quality of Life Survey Highlights Importance of Farmland Preservation

Farmland Preservation Month Quality of Life Survey Highlights Importance of Farmland Preservation

As published in the Ocala Star Banner on April 16, 2022:

April is Farmland Preservation Month in Marion County. In honor of this important designation by the Marion County Commission, Horse Farms Forever is pleased to present the results of the recently conducted Quality of Life Survey  in Marion County.

The Survey results concluded that residents feel strongly about protecting Marion County’s rural charm and beauty by preserving farmland and natural resources. Population growth, new development, roads, access to emergency services, and countywide internet service were also key issues of concern. The Survey was organized by Horse Farms Forever and supported by five sponsors including the Ocala Metro Chamber and Economic Partnership (Ocala CEP), College of Central Florida, Ocala Horse Properties, the Florida Thoroughbred Breeders’ and Owners’ Association (FTBOA), and the Hotel Design Group. The Matrix Group, an independent research firm, conducted the Survey in July 2021.

A representative sampling was mailed to approximately 15,000 residents and over 1,200 households responded. The demographics covered a broad spectrum of zip codes, education levels, and age groups. Nearly 60 percent were urban residents and about half were female.

“This is a great time to understand the community’s perspective to learn how best to plan and manage growth for the benefit of all in the near and distant future,” said Dr. Jennifer Fryns, Associate VP of Career and Professional Programs at the College of Central Florida about the Survey questionnaire.

The questions for the Survey covered a broad range of topics including growth, economic development, education, traffic, housing, tourism, and farmland preservation. Even with the broad range of Survey questions, it may come as no surprise that residents ranked the preservation of land and natural resources as the most important issue facing Marion County. The second most important issue was transportation and traffic, third was population growth, fourth was housing availability and affordability, fifth was economic development, sixth was employment opportunities. Other issues included education, internet access, and homelessness.

Over 90% of the respondents agreed with the statement:

Marion County’s Farmland Preservation Area is home to some of the richest soils and pristine fresh water aquifers in the world and that it is critical to maintain its resources to ensure that the community’s legacy as the Horse Capital of the World® remain for future generations.

In addition, 86% of respondents also supported comprehensive planning at the county level that both protects agricultural lands and enhances urban areas. The Survey is an important step in defining the issues facing Marion County.

Kevin Sheilley

“We can speculate as to what people think. We can talk to our friends and acquaintances, but we likely will only hear what we already know, so it can risk becoming an echo chamber,” said Ocala Metro CEP President Kevin Sheilley about the Survey questionnaire. “A survey gives a chance to get input and feedback from a broad spectrum of our community.”

Over the next 20 years, Marion County’s population is predicted to increase by 150,000 new residents to reach over 500,000 people, according to the US Census Bureau. This rapid growth has brought the topic of the preservation of land and natural resources to the forefront.

Matt Varney

“Ocala is incredibly unique in that it is growing on two different tracks. On one hand, we are adding diverse industry, housing and jobs – classic urban growth. But also, we have one of the largest regional farmland preservation areas in the country and a thriving equine industry dependent on those farms,” said Matt Varney, Broker with Ocala Horse Properties about the Survey questionnaire. “The survey will show the importance of both of these growth directions, and inspire our leaders to plan accordingly.”

The objective of the Survey was to gather information about how residents feel about their overall quality of life and vision for the community’s future. The results also have the potential to guide planning and policy decisions at the county level. Together with our partners and stakeholders, Horse Farms Forever® hopes to inspire positive and lasting change in terms of farmland preservation to help protect the open spaces and beautiful places that make Marion County so special. 

The mission of Horse Farms Forever is to inspire conservation of horse farms through education, awareness and idea exchange so as to preserve natural pasture land focusing on horses and their habitats, to protect soil and water on which they depend, and minimize land use conflicts in Marion County, Florida. Horse Farms Forever is located in Ocala, FL. www.horsefarmsforever.com

The Quality of Life Survey was conducted by The Matrix Group, an independent insights and consulting firm based in Lexington, Kentucky. The QOL Survey was mailed to 15,000 households, which is considered a representative sampling of the estimated 135,000 households in Marion County. 

Busy Shires

What About Zoning?

The Zoning regulations are found in the Land Development Code, which is a separate document with specific guidelines to implement the Goals, Objectives, and Policies of the Comprehensive Plan.

Zoning regulates development through land use classifications and specifies the areas in which residential, industrial, recreational or commercial activities may take place. The Land Development Code was adopted through a series of ordinances by the County Commission, which means that the regulations cannot be changed or waived, except by a further vote of the County Commission.

Always Watching

We work hard to keep you informed, and to represent our members' interests in preserving our horse farms, farmland and the unique character and culture of Marion County's 193,000 acre Farmland Preservation Area.

Join the herd. Every voice matters.

CR 318/I-75 Interchange Slated for High Density Development –  Includes Sunny Oaks RGAC

CR 318/I-75 Interchange Slated for High Density Development – Includes Sunny Oaks RGAC

On the map, the blue areas have a Future Land Use designation of Employment Center (includes residential and commercial/industrial) and the purple is Commerce District (limited to industrial and commercial uses.) The 453-acre Sunny Oaks Regional Activity Center (RGAC) border is designated by the yellow and black hash marks.

What We’re Watching in Irvine

The Irvine/Sunny Oaks Regional Activity Center is on the March 1, 2022, Marion County Commission agenda to request a change in zoning from Agriculture (A-1) to Planned Unit Development (PUD).

The PUD zoning classification is intended to provide a process for the evaluation of unique individually planned residential, commercial, industrial, and mixed-use developments, which may not otherwise be permitted in the standard zoning classifications established by this Division.

The proposed 453-acre Sunny Oaks PUD is a catalyst project that will forever change the rural and scenic character of the intersection at CR 318 and I-75 in Irvine. The community and local residents are justly concerned about the long-term impacts of the proposed 4 million square feet of commercial and warehouse space on traffic and their quality of life.

Because this project is located within the Farmland Preservation Area (FPA), Horse Farms Forever has recently spent hundreds of hours researching the proposed Sunny Oaks Zoning Request. We consulted with our land use attorney, key stakeholders and land use planners to better understand the complex legal issues and the scope of the previous development agreements and determine if there was a role for HFF. This is a summary of what we found.

Zoning Change

The Irvine/Sunny Oaks RGAC is adjacent to the Highway 318 interchange on I-75.  This interchange includes a Future Land Use Element designation in the Comprehensive Plan that includes an Employment Center, a Commerce District and a Regional Activity Center.  While this parcel is within the Farmland Preservation Area boundaries, these Future Land Use designations overlay and override the Farmland Preservation Area regulations and restrictions.

As a result of the above designations and classifications, the owner of this parcel has a legal right to rezone this parcel from agriculture to an implementing zoning district for the specific Future Land Use designation. This legal right was established in 2012 when the RGAC was created and revised in 2014.

While the requested zoning change is to Planned Unit Development, there are other options that would satisfy the legal obligation of the County to rezone the property to an implementing zoning district. Nonetheless, they all allow significant retail, commercial and industrial development.

The Marion County Growth Services Staff has done an excellent job in their report detailing the very complicated history and facts surrounding this parcel and the zoning change request.  In addition, the Growth Services report contains recommendations of significant conditions.  Most importantly, while the developer has provided a Conceptual Plan for the development, a Master Plan for the Planned Unit Development has not been provided, which is a required critical element in establishing the scope, scale and other details of the project.

Traffic Concerns

Traffic capacity and safety of the intersection at I-75 and CR 318 was also addressed in the staff report. The interchange has not been updated from the original 1964 design and CR 318 is a winding two-lane road with limited visibility on the east side of the interstate. The Growth Service’s staff report states: “Prior to obtaining final PUD Master Plan approval, completion and review of the project’s formal traffic study will be required with the resolution of any level of service and/or design deficiencies identified being addressed consistent with the applicable Land Development Code (LDC) provisions.”

If the Commissioners approve the zoning request to PUD, then a PUD Master Plan of the parcel is required. The Growth Services staff report states: “The final PUD Master Plan, or equivalent shall require review and approval by the Marion County Board of County Commissioners.”

Learn More About Sunny Oaks

A User-Friendly Guide to Zoning Jargon

Future Land Use (FLU) Designation: a classification of a property that explains what types of development can be built on that property in the future.

Future Land Use Map: The future land use map is a community’s visual guide to future planning. The future land use map should bring together most if not all of the elements of the comprehensive plan such as natural resources, economic development, housing and transportation.

Zoning: A method of urban planning in which a municipality or other tier of government divides land into areas called zones, each of which has a set of regulations for new development that differs from other zones.

What is the Difference Between Future Land Use (FLU) and Zoning?
Future Land Use FLU designations indicate the intended use and development density for a particular area, while zoning districts specifically define allowable uses and contain the design and development guidelines for those intended uses.

Planned Unit Development (PUD): A type of flexible zoning device that redefines the land uses allowed within a stated land area. PUDs consist of site plans that promote the creation of open spaces, mixed-use housing and land uses, environmental preservation and sustainability, and development flexibility.

Overlay Zone: A zoning district which is applied over one or more previously established zoning districts, establishing additional or stricter standards and criteria for covered properties in addition to those of the underlying zoning district.

Regional Activity Center (RGAC) in Marion County’s Comprehensive Plan: The purpose of a RGAC is: “To allow for compact, high intensity, high density multi-use development which may include a mix of the following uses: retail, office, housing, cultural, recreational and entertainment facilities, hospitality facilities (hotels and motels), and industrial uses that serve a regional area.”

Always Watching

We work hard to keep you informed, and to represent our members' interests in preserving our horse farms, farmland and the unique character and culture of Marion County's 193,000 acre Farmland Preservation Area.

Join the herd. Every voice matters.

Busy Shires

What About Zoning?

The Zoning regulations are found in the Land Development Code, which is a separate document with specific guidelines to implement the Goals, Objectives, and Policies of the Comprehensive Plan.

Zoning regulates development through land use classifications and specifies the areas in which residential, industrial, recreational or commercial activities may take place. The Land Development Code was adopted through a series of ordinances by the County Commission, which means that the regulations cannot be changed or waived, except by a further vote of the County Commission.

The Master Plan For I-75

The Master Plan For I-75

From The Turnpike to CR 234 – The Latest on Fifty Miles of Improvements

There is no doubt that I-75 is near capacity. To accommodate the projected population growth and increased truck traffic, the road’s capacity will have to be expanded.

Over the next 20 years, Marion County’s population will grow by about 150,000 new residents to reach nearly half a million people. In addition, the industrial warehouse space will increase to a total of 17M square feet. About half of the existing 11M square feet of industrial warehouse space is used by five distribution centers and an additional six million square feet of industrial warehouse space will be completed over the next 12 to 18 months.

This exponential growth will stretch the capacity of I-75 to its limits.

I-75’s capacity issues have been on the Florida Department of Transportation’s (FDOT) radar since 2016, with the formation of the I-75 Relief Task Force. The top recommendation from the Task Force was to improve the capacity of I-75. The second recommendation was to improve existing roads such as 41, 441 and 301.

In 2018, the Coastal Connector was proposed by FDOT, but since that was rejected, I-75 became the focus again in 2019. (The Northern Turnpike Extension was proposed by the Florida Turnpike Enterprise (FTE), which is part of FDOT in 2021).

Scope Of The Project

In 2021, FDOT decided to take a step back and refresh the Master Plan for I-75. The project starts in Sumter County at the northern terminus of Florida’s Turnpike in Wildwood and goes north for 47.8 miles to County Road (CR) 234 just north of Marion County. 

 

The Master Plan will only evaluate upgrading I-75 within the existing corridor. The project is divided into two sections for the purposes of the study.

Section 1 starts at the Florida Turnpike to 22.5 miles north to State Road (SR) 200.

Section 2 starts at SR 200 in Marion County to 25.3 miles north to County Road (CR) 234 in Alachua County.

Timeline

The work on the I-75 Master Plan began in June, 2021. The draft  Master Plan report will be available sometime in June, 2022. A public meeting will be held in summer, 2022 for public comment and the final Master Plan report is due in November, 2022. The next phase is PD&E followed by Design and Construction. The FDOT Project Manager for the I-75 Master Plan is Mary McGehee. FDOT is also working with two consulting engineering firms, Volkert and HDR, Inc. to conduct the I-75 Master Plan study.

“The Master Plan will look at the short-term and the long-term solutions,” said Steven Schnell, an engineer with HDR, Inc. “The long-term solution looks out to 2050 and what needs to be done. This is such a long corridor and it will be implemented in phases to determine what is the best strategy and plan going forward.”

Some of the short-term solutions include enhanced ramps and better signals at some of the interchanges. The intersections at CR 236, SR 40 and SR 200 will also be improved.

“The biggest issues are at CR 326,” said McGehee. “That’s where the trucks are getting on and off of I-75. The two truck service centers at this intersection also adds to the congestion as the trucks intermingle with the cars.”

The long-term improvements will be included in the Master Plan study and potentially include adding two additional lanes and new interchanges. The goal is to improve the traffic flow and safety, and to further reduce the amount of time to clear traffic incidents. The variation in the traffic due to the holidays, weekends, inclement weather, incidents and the truck traffic will also be addressed in the report.

Ocala’s Strategic Location

FDOT has the Herculean task of planning for the future transportation needs for Marion County. The good news is that the majority of the road improvements are made within existing corridors.

Marion County is growing quickly and the roads must also grow. Ocala’s strategic location between several major cities and readily available land along I-75 is one of the reasons several large distribution centers have chosen Ocala for their relocation or expansion needs. For tourists and commuters, I-75 is also the most direct route to the Turnpike and to south Florida’s popular west coast.

42 Projects

There are currently 42 FDOT projects in Marion County that are at various stages. You can submit comments or ask a question about each project on the FDOT District Five website.

We’ll Be Watching

The improvement of I-75 is one of the most significant transportation issues facing the county. I-75 also runs through the Farmland Preservation Area, so we will be monitoring the I-75 Master Plan and attending the public meeting this summer. We thank the FDOT team for updating us about the road improvement project because it will have a tremendous impact on the quality of life in Marion County. FDOT has decades of institutional experience and their goal is to make I-75 better and safer for all travelers.

 

Already In The Design Phase

New I-75 Interchange at NW 49th Street/NW 35th Street

The Florida Department of Transportation (FDOT) is building the new interchange at NW 49th Street/NW 35th Street. According to the FDOT website, the Project Development and Environment (PD&E) Study was completed in March 2021 and the project is currently in the design phase. The FDOT Design Project Manager is Megan Owens and the Design Firm is Metric Engineering.

Construction is anticipated to begin in August of 2024. The cost of the project is approximately $41 million for construction. The estimated time frame for completion is 1 to 3 years.

Read our blog on this project

Link to the PD&E study and a comment form to send comments to FDOT.

Busy Shires

What About Zoning?

The Zoning regulations are found in the Land Development Code, which is a separate document with specific guidelines to implement the Goals, Objectives, and Policies of the Comprehensive Plan.

Zoning regulates development through land use classifications and specifies the areas in which residential, industrial, recreational or commercial activities may take place. The Land Development Code was adopted through a series of ordinances by the County Commission, which means that the regulations cannot be changed or waived, except by a further vote of the County Commission.

Always Watching

We work hard to keep you informed, and to represent our members' interests in preserving our horse farms, farmland and the unique character and culture of Marion County's 193,000 acre Farmland Preservation Area.

Join the herd. Every voice matters.

Marion County Five-Year Strategic Plan Takes Farmland Preservation Into Account

Marion County Five-Year Strategic Plan Takes Farmland Preservation Into Account

Marion County In The Binoculars

Every five years, the Marion County Commission adopts a five-year Strategic Plan to help guide growth and development. The draft Marion County Administrative Strategic Plan 2022 – 2026: Empowering Marion for Success, was presented to the Board of County Commissioners (BOCC) at a workshop held on July 7, 2021. The purpose of the workshop was to present the draft plan to the County Commission and receive their input on staff’s recommendations.

The Strategic Plan is organized into five Elements:

  1. Organizational Experience
  2. Resources and Facilities
  3. Planning and Future Growth
  4. Public Infrastructure
  5. Public Safety

Every County department developed recommendations, action steps, and potential funding sources. This plan takes a comprehensive approach to planning for growth to help ensure that the County is able to keep up with the demand in services and provide good customer service overall.  The plan’s Executive Summary states:

“As with the previous five-year plan, this plan will be the road map for our operations as we continue to deliver services to our citizens and visitors at the highest possible level.”

The good news is that the Strategic Plan includes several recommendations to protect the Farmland Preservation Area (FPA) and to help retain Marion County’s unique rural character. It makes several recommendations to:

“focus on our outdoor assets and natural resources to preserve their quality so they continue to define their character and play a major role in attracting visitors and guests to Marion County and represent a positive economic impact.”

Strategic Plan Major issues:

  • Staffing shortage in some County departments
  • The availability of affordable workforce housing and apartments for rent
  • Multiple road widening and expansion projects
  • Lack of public infrastructure, libraries, and recreational opportunities in some areas of the county
  • Aging infrastructure and buildings
  • Urban sprawl

Strategic Plan Goals:

  • Providing incentives for infill and multi-family housing developments
  • Directing growth to vested developments
  • Expanding roads and trail networks
  • Providing expanded recreational opportunities
  • Developing user friendly information about parks to increase outdoor tourism
  • Preserving natural resources
  • Protecting water quantity and quality
  • Providing a safe community

Spotlight On Element 3: Planning and Future Growth

Mounir Bouyounes, Marion County Administrator, introduced the Strategic Plan and emphasized the amount of work done on the Planning and Future Growth Element.

“There are a lot of new ideas and information being presented to you. It’s not new, but these are ideas that we are bringing to the forefront and see where we take it from here,” said Bouyounes.

Angel Roussel, Assistant County Administrator, Public and Environmental Services Director, led the team for the Planning and Future Growth Element. The report included input from several stakeholders to understand the County’s strengths and weaknesses. The Planning and Future Growth Committee met with multiple County departments and stakeholders in the community and some of their suggestions were incorporated into the report.

Roussel emphasized that new growth and development should be focused within the Urban Growth Boundary (UGB) and in strategic areas including the FL Cross Roads Commerce Park, SR 200, World Equestrian Center (WEC) and the NW 49th Street Interchange area.

“This will help us stay out of the Farmland Preservation Area and focus on infill,” said Roussel. “It’s all a balancing act.”

Development Pressure On The FPA Boundary

There are several recommendations to help protect the Farmland Preservation Area in the Strategic Plan but several new roads proposed as “vision projects” near the southeast corner of the FPA boundary near the intersection of CR 225A and US Hwy 27 will increase development pressure in that area. Vision Projects are not yet approved or funded. The pink lines on the map above show the locations of these Vision Project roads, all located outside the Farmland Preservation Area. The green and yellow lines show approved project roads.

A new road is proposed to connect SW/NW 80/70th Avenue to SW 60th Avenue and also provide access north to US 27.

Another new road is proposed that will run parallel to I-75 on the east side of I-75 that will connect to CR 326. This new road is an extension of NW 39th Avenue Road, which is where the distribution centers for Amazon, Chewy’s, Auto Zone, and Fed Ex are located.

In addition to the two new roads, NW 44th Avenue, an existing road which runs parallel to I-75 from US 27 to CR 326 on the west side of the interstate, was recommended to be four-laned from NW 63rd Street to CR 326. The south end of NW 44th Avenue is already four-laned. In order to maintain the level of service for the road due to the increase in residential, industrial and warehouse development, four-laning the rest of NW 44th Avenue is necessary.

If approved, these would be in addition to the already approved extension of NW 49th Street – a road that will connect CR 225A to the new I-75 interchange. About half of the road, Section 3A, is funded for construction in fiscal year 2020/2021. The second half of the road is funded for construction for fiscal year 2022/2023. See our blog about the SW/NW 80/70th Avenue road-widening project for background: https://www.horsefarmsforever.com/update-sw-nw-80th-70th-avenue-road-widening-and-northern-turnpike-extension/

Farmland On The Forefront

The recommendations to help protect the Farmland Preservation Area include:

  • Create an FPA inventory for Analysis: Analyze the designated FPA and create an inventory of the existing farmland including location, acreage, zoning, physical land use and any other designation.
  • Family Division Analysis: Research and review the family divisions that have occurred in the past and analyze the effectiveness by determining if said family divisions remain within the family ownership.
  • Opportunity Zones & Farmland Preservation Overlap Analysis: Analyze the validity of this designation and make recommendations to explore the efficacy of retaining the FPA within an Opportunity Zone.
  • Protect the rural character of the Farmland Preservation Area by Creating additional Buffering:  By providing buffer alternatives, future development will have a predictable specification, which will ease new development while preserving the rural character of this resource.
  • Review and Modify the Transfer of Development Rights Program: Review the Transfer Development Rights program and propose changes if needed to ensure maximum effectiveness of the program.

Builders Make a Case For Higher Density

At the end of the meeting, there was an opportunity for public comments. Florida House of Representatives Stan McClain attended the meeting, but he was representing the building Industry instead of the legislative agenda.

“We are 4,000 units short. Even if we built 4,000 houses tomorrow, we would be behind the next day,” said McClain. He said the building industry understands the water and sewer issues and suggested that the BOCC consider higher density due to the increased property values. “With land values now, the lots in Silver Springs Shores were $8,000, but now that same lot is $25,000. You are going to have to look at density and putting water and sewer in,” he said. “When you talk about sprawl, sprawl happens when you do ¼ acre lots everywhere, so you have to find places where we can get the densities right and approve them. That’s just the way it is, otherwise we will continue to sprawl.”

Commissioner Kathy Bryant added some final comments about the future of Marion County:

“Growth is here and it’s happening and we are not stopping growth and I don’t think there is anyone sitting on this Board that has the intention of stopping growth. But I will say for me, I think a lot about it. When I drive down the turnpike and I’ve got to Orlando and you just see the fields of houses – the rooftop after rooftop after rooftop. I don’t want our County to look like that. I’m sorry and I know that there is some development that will look like that, but it doesn’t mean we can’t still  make it a nice place to live. In 20 or 30 years, what kind of legacy are we leaving?”

Protect Against Urban Sprawl

Things are moving fast in Marion County. Horse Farms Forever is a farmland watch dog, attending countless hours of hearings and meetings. When action is required, we are there at the table. Join us to stay informed and ready to respond when public comments are needed. Together we can protect and preserve our open spaces and beautiful places for future generations.

Dig Deeper

Link to the Marion County Administrative Strategic Plan 2022 – 2026: Empowering Marion for Success

VIDEO of the July 7, 2021 BOCC WORKSHOP:
The Planning and Future Growth Element starts at 1:04.52 in the video link.

Busy Shires

What About Zoning?

The Zoning regulations are found in the Land Development Code, which is a separate document with specific guidelines to implement the Goals, Objectives, and Policies of the Comprehensive Plan.

Zoning regulates development through land use classifications and specifies the areas in which residential, industrial, recreational or commercial activities may take place. The Land Development Code was adopted through a series of ordinances by the County Commission, which means that the regulations cannot be changed or waived, except by a further vote of the County Commission.

Always Watching

We work hard to keep you informed, and to represent our members' interests in preserving our horse farms, farmland and the unique character and culture of Marion County's 193,000 acre Farmland Preservation Area.

Join the herd. Every voice matters.